Here is where we try to chronicle the rise and fall of the Broken Arrow
Photon.
First, the building before we started construction
|
|
|
Bulldozer
Removing the old stuff |
|
|
|
Destruction
Removing an old office from the arena |
|
|
|
Arena floor
Removing the old floor tiles where the arena will be built |
|
|
|
Lobby
Front Desk will go here eventually |
|
|
|
Front Door
Looking at the front door from where the desk will be built |
|
|
|
|
Lobby
The lobby from the front door |
|
|
|
Arena
Looking through the staging area to the arena |
|
|
Next, the construction
|
|
|
Bunker
Looking from red side to the center bunker |
|
|
|
Upper Deck
Looking from the red snipers nest |
|
|
|
Observation Deck
Looking towards the center of the arena |
|
|
|
Decking
Looking from the red side |
|
|
|
Decking
Bridge on red side |
|
|
|
|
Red side
From red snipers deck |
|
|
|
Red Bridge
Red back ramp in background |
|
|
|
Green Bunker
Green side bunker getting framed out |
|
|
|
Green Side
Green side snipers nest |
|
|
|
Tower Frame
Red tower |
|
|
|
|
Catacombs
Catacombs on the red side |
|
|
|
Painting
Starting to paint the arena |
|
|
|
Observation Sign
Getting the signs ready |
|
|
|
Red Side
Red side sans paint |
|
|
|
Green Tower
Getting drywall installed |
|
|
|
|
Green Tower
Head installed on Green Tower |
|
|
|
Bathrooms
New, expanded bathrooms |
|
|
Finally, the finished arena
|
|
|
Arcade
|
|
|
|
Crew
The employees |
|
|
|
Front Desk
Check-in and score card printouts |
|
|
|
Front
Just inside of front door |
|
|
|
Game Computer
Where everything was run |
|
|
|
|
Staging Area
Ramp to the ob deck and staging area |
|
|
|
Arcade
Pinball machines |
|
|
|
Ping pong tables
|
|
|
|
Green Side
|
|
|
|
Green Tower
|
|
|
|
|
Green Tower
|
|
|
|
Red Side
|
|
|
|
Red side bunker
|
|
|
|
Red Tower
|
|
|
|
Scores
Score Display |
|
|
|
|
Staging
|
|
|
|
Lobby
|
|
|
|
Store Front
|
|
|
|